中文十次啦,亚洲综合图片色婷婷另类小说,久久频这里精品香蕉久久,青青草国产精品视频,亚洲自拍 AV天堂,亚洲国产AV日韩AV二区色欲,亚洲日韩AV中文字幕免费

NEWS CENTER
The thermal shock project of Sulzer passed the acceptance
Time:2021-05-19 Author: Number of views:1867

Recently, the thermal shock test project of the main feed water pump of the nuclear power plant that POWERFLOW Control Co., Ltd participated in the design and construction has been a complete success. The test results have won unanimous praise from the Sulzer and the end user.。

   
The thermal shock project was completed on the basis of the high temperature and high pressure boiler feed water pump test bench supplied to Sulzer in 2014 by our company. During the start of the test main pump, the water temperature rose rapidly from below 40°C to 185°C within 3s, and continued to run at this high temperature, far exceeding the established target of 15s. After on-site testing by our customer as well as the experts of the acceptance team, they unanimously agreed to pass the acceptance.

      
Sulzer founded in 1834, it is a global leader in pumps, surface treatment technology, chemical machinery, and turbine services. The successful cooperation with Sulzer again marks that POWERFLOW's nuclear pump testing capability has reached a new level. All our company employees will always adhere to the concept of seeking truth from facts and excellence, and continue to provide customers with first-class products and services.




Return list
Share to:
福建美芮网络科技有限公司 | 成都市锦江区上研成人培训学校有限公司 | 合肥市美匠职业培训学校有限公司| 海南心旅行教育文化发展有限公司 | 苏州万益宏节能科技有限公司|